jamejones's Avatar

jamejones

Location Pin
Thailand
10841 Video
3009 Foto

Informazioni

Nessuna informazione

Artista Pond5 da 2012

Parole chiave

00:10
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 320267673
00:18
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 320587099
00:34
Helsinki Public Transport
jamejones jamejones
Helsinki public transport Video stock 40050357
Disponibile nell'abbonamento
00:19
Red, Yellow, Green Traffic Light
jamejones jamejones
Red, Yellow, Green Traffic Light Video stock 70685436
00:25
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 320435907
00:23
Drilling Rig Flood Light In The Middle Of Raining
jamejones jamejones
Drilling Rig Flood Light in the Middle of Raining Video stock 52887594
00:28
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 336342736
00:17
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 321169164
00:27
Aerial Shot With From A Drone. Flying Over Tea Plantation
jamejones jamejones
Aerial shot with from a drone. Flying over tea plantation Video stock 74317421
00:15
Waste Water Discharge Into The Drainage Area
jamejones jamejones
Waste water discharge into the drainage area Video stock 343325837
00:45
Offshore Supply Vessel For Oil Drilling Rig In The Middle Of Ocean
jamejones jamejones
Offshore Supply Vessel For Oil Drilling Rig in The Middle of Ocean Video stock 299259470
00:11
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 327782547
00:28
Run In Hole Of Premium Standalone Mesh Sand Control Screens
jamejones jamejones
Run in Hole of Premium Standalone Mesh Sand Control Screens Video stock 346998995
00:33
Standpipe Manifold And High-Pressure Valve Assembly
jamejones jamejones
Standpipe Manifold and High-Pressure Valve Assembly Video stock 337801816
00:14
Offshore Flare Gas Is The Excess Natural Gas From Oil And Gas Production
jamejones jamejones
Offshore flare gas is the excess natural gas from oil and gas production Video stock 324268025
00:18
Video 202509The Plane Was Flying Over Songkhla, Thailand.
jamejones jamejones
Video 202509The plane was flying over Songkhla, Thailand. Video stock 326701935
00:10
Top Drive System (Tds) Spinning For Oil Drilling Rig - Oilfield Industry
jamejones jamejones
Top Drive System (TDS) Spinning for Oil Drilling Rig - Oilfield Industry Video stock 54656659
00:15
Drilling Mud Return Flow And Flow Sensor Paddle In The Rig Flowline
jamejones jamejones
Drilling Mud Return Flow and Flow Sensor Paddle in the Rig Flowline Video stock 347333005
00:29
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 320970038
00:15
Heavy Rainfall Causes Severe Urban Flooding In Bangkok
jamejones jamejones
Heavy Rainfall Causes Severe Urban Flooding in Bangkok Video stock 346450973
00:26
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 320435773
00:14
Abstract Blue Water Ripple Texture Background
jamejones jamejones
Abstract blue water ripple texture background Video stock 54656873
00:26
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 328386375
00:30
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 326011670
00:41
Used Mud Motor And Digger Bit Racked Back On The Drill Floor
jamejones jamejones
Used Mud Motor and Digger Bit Racked Back on the Drill Floor Video stock 337679959
00:16
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 320970149
00:26
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 320267687
00:15
Dinosaur At One Of The Entrance Of The Natural History Museum In London
jamejones jamejones
Dinosaur at one of the entrance of The Natural History Museum in London Video stock 64896536
00:27
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 325405197
00:22
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 320655869
00:17
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 330087851
00:19
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 332444919
00:09
Aerial View Of Offshore Jack Up Rig In A Shipyard During Daytime
jamejones jamejones
Aerial view of offshore jack up rig in a shipyard during daytime Video stock 322951294
00:20
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 333076630
00:30
Drilling Mud Return Flow And Flow Sensor Paddle In The Rig Flowline
jamejones jamejones
Drilling Mud Return Flow and Flow Sensor Paddle in the Rig Flowline Video stock 347750054
00:12
Oil Spill Boom (Buoy) Guard For Anti Leak-Oil Surface
jamejones jamejones
Oil spill boom (Buoy) guard for anti leak-oil surface Video stock 323905123
00:16
Areal View Of Beautiful Beach And Coastline In Chumphon Thailand
jamejones jamejones
Areal view of beautiful beach and coastline in Chumphon Thailand Video stock 308896738
00:20
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 336342719
00:30
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 321169469
00:15
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 330555908
00:16
Dramatic Sky Taking From The Plane
jamejones jamejones
Dramatic sky taking from the plane Video stock 308897940
00:19
Country And Marina City Abandoned Construction Project
jamejones jamejones
Country and Marina City abandoned construction project Video stock 313164826
00:21
Jabreen Castle Is A Beautifully Restored 17Th-Century Omani Palace
jamejones jamejones
Jabreen Castle is a beautifully restored 17th-century Omani palace Video stock 320439845
00:13
Aerial View From Airplane Of Cumulus Cloudscape Seen From A Window Plane
jamejones jamejones
Aerial view from airplane of cumulus cloudscape seen from a window plane Video stock 323888974
00:11
Oman Flag Waving By The Wind
jamejones jamejones
Oman flag waving by the wind Video stock 304251491
00:25
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 320587753
00:27
Aerial View Of Offshore Jack Up Rig And Offshore Platform During Sunset
jamejones jamejones
Aerial view of offshore jack up rig and offshore platform during sunset Video stock 337007192
00:15
Blue Sky Sea And Clean Beach At Nyaung Oo Phee Island, Myanmar
jamejones jamejones
Blue sky sea and clean beach at Nyaung Oo Phee island, Myanmar Video stock 111182092